Plan-view length × width.
IRC R312 requires a 36″ guardrail above 30″.
192 sq ft · Mid composite · 1.22× labor · 1.10× complexity
IRC R312 mandates a 36″ guardrail on open edges when deck height exceeds 30″. 40 lf priced at Mid composite tier.
Northeast typical permit fee is in the budget. Most jurisdictions require a permit for decks > 200 sqft, > 30″ above grade, or attached to the house.
Mid composite uses hidden-fastener clip systems (Cortex / CamoClip / Trex Universal) — labor takes 25–30% longer than face-screwing PT. Already inside the tier's installed $/sqft band.
| Cost component | Share | Amount |
|---|---|---|
| Materials | 26% | $7,603 |
| Labor | 39% | $11,337 |
| Add-ons | 24% | $6,978 |
| Soft costs | 1% | $320 |
| Contingency | 9% | $2,624 |
| Total (high est.) | 100% | $28,862 |
Share of the high estimate. Switch tiers below to repaint the split.
National-median pricing (2026-Q1). Local prices vary ±15%. Materials line uses Mid composite tier; switch tiers to repaint the budget. Includes 10% contingency reserve on the high estimate.
Photoreal 3D · plan view · framing breakdown. Color matches your tier selection.
The Deck Material Calculator gives you a permit-ready bill of materials — every joist, hanger, fastener, and footing — validated against IRC 2021 span tables.
Estimates use 2026-Q1 national-median pricing (Home Advisor, Angi, RSMeans). Expect ±15% variance vs your local market. Always get 3 contractor bids before signing. This calculator is not a substitute for a licensed inspector or structural engineer.